Hugh Simpson Contractors Hugh Simpson Contractors - Northern Scotland`s leading lifting and plant-hire firm.

Telephone 01955 604444

Office Address South Quay, The Harbour, Wick, KW1 5HA

Case Studies

Wind turbine maintenance, Causeymire

Posted: July 17th, 2024

We were involved in maintenance works on Causeymire windfarm, which included the exchange of the blade bearing. Customer on this project was Deutsche Windtechnik who planned the lifting operations and our cranes were working under their instruction.

Unloading transformer and ancillaries, Scrabster Harbour

Posted: July 17th, 2024

We were involved in planning and carrying out vessel discharge operations to unload a 125t transformer and various ancillary items from a vessel to truck and quayside in Scrabster Harbour. Collett Heavy Lifting Ltd was our customer on this project.

Unloading components from vessel to trucks/ Quayside, Scrabster Harbour

Posted: July 17th, 2024

We were involved in providing contract lift services in unloading vessels in Scrabster Harbour. The project involved 2 shipments each carrying a 138.5 tonne Stator, 129 tonne Rotor and other components for Thurso South Substation. CUSTOMER FEEDBACK Trans Global Projects Lt. Manager Ginny Parry says: “Exceptional service.”

Load test of a cantilever HALO with a swivel beam assembly

Posted: July 17th, 2024

We were involved in planning and carrying out the load testing of a cantilever HALO with a swivel beam assembly at Gows in Lybster. Torquer Ltd was our customer on this Project. Our Approach Our 300t crane was rigged to customers requirements to lift the Cantilever beam and …
Read more…

Limekiln windfarm components, Scrabster Harbour

Posted: July 17th, 2024

Windfarm components arriving by sea to Scrabster Harbour, where they get discharged and stored for forward transport to Limekiln windfarm site. We have been involved in the vessel discharge operations, re- loading to transport and unloading on site. The Limekin windfarm includes 24 wind turbines (manufactured by Vestas) …
Read more…

Camster II windfarm components, Wick Harbour

Posted: July 17th, 2024

Windfarm components arriving by sea to Wick Harbour, where they get discharged and stored for forward transport to Camster II windfarm site. We have been involved in the vessel discharge operations, re- loading to transport and unloading on site. The Camster II windfarm includes 10 wind turbines (manufactured …
Read more…

Unloading pipes, Wick Harbour and moving to Customer site

Posted: July 17th, 2024

Customer Liberty Steel for Subsea7 Project overview Hugh Simpson (Contractors) Ltd unloaded 7 out of 8 shipments of pipes from Hartlepool to Wick harbour. The Project involved unloading in total over 600 loose pipe with outer diameter between 956.2 to 1354 mm, single length app. 27.3 m. First …
Read more…

Discharging pipes from MV Eems Transporter, Scrabster & Wick Harbours

Posted: March 20th, 2024

Customer Drewes Group Project overview Hugh Simpson (Contractors) Ltd unloaded 2 shipments of pipes from MV Eems Transporter at Scrabster and Wick harbours. The Project involved unloading in total 1095 loose pipe with outer diameter 406,40mm, single length app. 12,30 m. First of the vessels arrived in Scrabster …
Read more…

Vessel discharge operations, Scrabster Harbour

Posted: March 13th, 2024

Customer Trans Global Projects Ltd. Project overview MV Wilson Mosel arrived in Scrabster Harbour on the 6th March carrying  a stator, rotor and cooler boxes for the Thurso South Substation.  This is one of the 2 shipments coming to Scrabster. On this lift we used our 700t Liebherr …
Read more…

Unloading pipes, Wick Harbour

Posted: December 12th, 2023

Customer SubSea7 Project overview Hugh Simpson (Contractors) Ltd unloaded 2 vessels carrying in total 840 pipes at Wick harbour. Once discharged from the vessel the pipes were transported to Wester site. Read other case studies here. To find out more about the lifting services available from us get …
Read more…

Transporting pipes, Wick to Wester

Posted: December 12th, 2023

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd transported 27.4 m long, Ø956.2 and 1354mm pipes from Wick Harbour to Wester site.   Read other case studies here. To find out more about the lifting services available from us get in touch with our team here.

Unloading pipes, Wick Harbour

Posted: December 12th, 2023

Customer Liberty Steel Project overview The first vessel HS Fairness arrived in Wick Harbour on the 16th October carrying 82 pipes.  Over the coming month Hugh Simpson (Contractors) Ltd  will be unloading further 7 vessels. On this lift we used our 300t Liebherr crane fitted with the vacuum …
Read more…

Lifting windfarm components in Glasgow KGV docks and Port of Ayr

Posted: January 25th, 2023

Customer Kestrel Liner Agencies Ltd Project overview 2021-ongoing Hugh Simpson (Contractors) Ltd unloaded windfarm components for Kennoxhead, South Kyle, Cumberhead and Kype Muir windfarm projects, working in Glasgow King George V docks and in the Port of Ayr. Recently we have been involved in handling windfarm components for …
Read more…

Lifting 14 cable reels, MV Baltic Moon in Wick Harbour

Posted: December 13th, 2021

Customer NKT A/S Project overview Hugh Simpson (Contractors) Ltd. discharged 14 cable reels that were delivered to Wick Harbour. Our approach Mobile crane wad positioned and set up. The boom was set to the desired lengths. An exclusion area was created with Heras fence set up around the …
Read more…

Moving beams from Scrabster harbour

Posted: September 20th, 2021

Customer Grahams Construction Limited Project overview 17/09/2021 Hugh Simpson (Contractors) Ltd transported pre fabricated concrete beams from Scrabster harbour storage compound to the installation site. The first visit of beam movement involved transporting 31 of the total of 76 beams that are  currently stored in a storage compound …
Read more…

Unloading concrete beams from BBC Marmara, Scrabster harbour

Posted: September 20th, 2021

Customer Grahams Construction Limited Project overview 30/07/2021 Hugh Simpson (Contractors) Ltd unloaded 76 pre fabricated concrete beams from MV BBC Marmara at Scrabster harbour. The vessel carried in total 76  beams which were each between 7 and 24 m long and weigh between 3.4 and 43.3 Ton. Our …
Read more…

Transportation of a door structure

Posted: September 20th, 2021

Customer JGC Engineering & Technical Services Ltd Project overview 22/07/2021 Hugh Simpson (Contractors) Ltd transported a door structure which has been built in a dual purpose restraint and transport frame: The lorry trailer arrived on site to allow the structure to be loaded on to the trailer Both …
Read more…

Discharging windfarm components from MV Aramis, Inverness Harbour

Posted: November 18th, 2020

Customer Kestrel Liner Agencies Ltd Project overview 16/11/2020 Hugh Simpson (Contractors) Ltd unloaded Glen Kyllachy wind farm components at Inverness harbour. The first of eight vessels MV Aramis arrived at Inverness Harbour on Monday carrying 27 blades each 44 m long and weighing  12.5 Tonnes. Hugh Simpson (Contractors) Ltd …
Read more…

Discharging piles from MV Wilson Lista, Scrabster Harbour

Posted: August 10th, 2020

Customer SPI McGrattan Project overview 07/08/2020 Hugh Simpson (Contractors) Ltd unloaded piles from MV Wilson Lista at Scrabster harbour. Wilson Lista is the first of two vessels delivering piles as part of this project. The vessel carried in total 90  tubular piles which were each between 24.4 and …
Read more…

Gearbox exchange, Black Law windfarm

Posted: February 28th, 2020

Customer Scottish Power Renewables Project overview 31/05/2020 Hugh Simpson (Contractors) Ltd. lifted gearbox at Black Law Windfarm (North Lanarkshire). Black Law Windfarm is one of the largest windfarms in the UK and our 500t crane team has been returning to the site to carry out lifting operations as …
Read more…

Unloading pipes from MV H&S Prudence, Wick Harbour

Posted: October 28th, 2019

Customer Vallourec Deutschland GmbH Project overview Hugh Simpson (Contractors) Ltd unloaded 775 pipes (11.9-12.5 m long with 219-406 mm outer diameter from marine vessel H&S Prudence, which arrived in Wick Harbour on 22/10/2019. Two cranes rigged with spreader beams and pipe shoes were set up, to unload pipes …
Read more…

Unloading sea containers from MV Vantage, Scrabster harbour

Posted: October 17th, 2019

Customer Eimskip Agency Project overview 15/10/2019 Hugh Simpson (Contractors) Ltd was unloading sea containers from a MV Vantage at Scrabster harbour. Vantage is a cargo ship with the overall length of 100 m. We have been unloading containers at Scrabster harbour on a regular basis, however this was …
Read more…

Agency services to Rix Sea Shuttle

Posted: October 4th, 2019

Customer Rix Sea Shuttle Project overview Starting from April 2017 Hugh Simpson (Contractors) is providing agency services to Rix crew transfer vessels Rix Lynx, Rix Cheetah, Rix Lion and Rix Panther throughout their project on Scotland`s largest windfarm Beatrice near Wick. We arranged personnel movement, accommodation and travel, …
Read more…

Unloading pipes from MV Wilson Wisla, Wick Harbour

Posted: July 22nd, 2019

Customer Mannesmann Line Pipe GmbH Project overview Hugh Simpson (Contractors) Ltd arranged the shipment and unloading of 932 raw black steel pipes (12.2 m long with 406.4 and 273.1 mm outer diameter) from a marine vessel Wilson Wisla, which arrived in Wick Harbour on 22/07/2019. Two cranes were …
Read more…

Movement of specialised fabricated steel modular units

Posted: July 1st, 2019

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd transported specialised fabricated steel modular units from JGC T3 building in Janetstown to Scrabster harbour. The biggest unit was 7.1 m wide, 14.4 m long and 6.0 m high. The height of the trailer and load was 6.9 m. The route was …
Read more…

Unloading pipes from MV Lady Ariane, Wick Harbour

Posted: June 28th, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from a marine vessel Lady Ariane, which arrived in Wick Harbour on 27/06/2019. Two cranes were set up, fitted with vacuum lift units to unload …
Read more…

Unloading pipes from MV Fluvius Plym, Wick Harbour

Posted: June 21st, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded 90 pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from marine vessel Fluvius Plym, which arrived in Wick Harbour on 19/06/2019. Two cranes were set up, fitted with vacuum lift units to unload …
Read more…

Discharging railway lines from MV Amy, Scrabster Harbour

Posted: June 18th, 2019

Customer GP Shipping Project overview 17/06/2019 Hugh Simpson (Contractors) Ltd unloaded railway lines from MV Amy at Scrabster harbour. Hugh Simpson (Contractors) Ltd was responsible to discharge 784 railway lines, each 18 m long and weighing  0.86 Tonnes. The rails  were lifted in bundles of 5, each bundle 4.3 Tonnes. …
Read more…

Unloading pipes from MV Scot Trader, Wick Harbour

Posted: June 10th, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded 117 pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from  marine vessel Scot Trader, which arrived in Wick Harbour on Friday.  Two cranes were set up: one fitted with a vacuum lift and another with …
Read more…

Transportation of specialised fabricated steel modular units, Janetstown

Posted: May 15th, 2019

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd transported specialised fabricated steel modular units from JGC T3 building in Janetstown to Scrabster harbour. The biggest unit was 7.1 m wide, 14.4 m long and 6.0 m high. The height of the trailer and load was 6.9 m. The route was …
Read more…

Unloading pipes from MV Helen Anna, Wick Harbour

Posted: March 13th, 2019

Customer Kestrel Liner Agency Ltd. Project overview 04/03/2019 Hugh Simpson (Contractors) Ltd. unloaded in total 1652 steel pipes from a Marine Vessel Helen Anna, which arrived in Wick harbour on Monday. We operated a crane and a vacuum pipe lifter simultaneously to discharge the vessel. The unloading required …
Read more…

Discharging lime boat Eems Delta, Wick Harbour

Posted: March 11th, 2019

Customer Hugh Simpson (Contractors) Ltd. Project overview 11/03/2019 Hugh Simpson (Contractors) Ltd. discharged in total 1586 tonnes of bulk ground lime from a Marine Vessel Eems Delta, which arrived in Wick harbour on Sunday. We operated two material handlers with clamshell bucket attachments. Lime was loaded directly into …
Read more…

Unloading pipes from MV Peak Amsterdam, Wick Harbour

Posted: March 11th, 2019

Customer Kestrel Liner Agency Ltd. Project overview 16/01/2019 Hugh Simpson (Contractors) Ltd. unloaded in total 1092 steel pipes from a Marine Vessel Peak Amsterdam, which arrived in Wick harbour on Wednesday. We operated two cranes simultaneously to discharge the vessel. The unloading required two teams with four slingers/ …
Read more…

Unloading reefer ship Svartfoss, Scrabster Harbour

Posted: January 30th, 2019

Customer Eimskip Agency Project overview 29/01/2019 Hugh Simpson (Contractors) Ltd unloaded refrigerated cargo from Svartfoss at Scrabster harbour. Hugh Simpson (Contractors) Ltd acted as stevedores in cooperation with  Sandisons shipping, which is the shipping agent that liaises with the customer, harbour authorities, ships crew and transport company. We have been …
Read more…

Dismantling lighting tower, Wick Harbour

Posted: December 10th, 2018

Customer Wick Harbour Authority Project overview 6/12/2018 Hugh Simpson (Contractors) Ltd. dismantled and removed a lighting tower from Wick Harbour Commercial quay. The lighting tower was over 30 m high, which required our operatives to work at considerable heights. The tower was cut in 4 sections, each approximately …
Read more…

Unloading rail wagons with 18 and 27 m pipes, Georgemas

Posted: October 4th, 2018

Customer Deutsche Bahn Project overview Pipes arrive at Georgemas by rail, where our team unloads them directly onto the lorry or onto the storage at site. Pipes are 18 and 27 m long with 1472  and 1253 mm outer diameter and each pipe weighs around 13 tons. The project will …
Read more…

Transportation of 8 x 8 m steel structures

Posted: October 2nd, 2018

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd conducted the loading of steel units onto trailers at two JGC locations at T3 building in Janetstown and at Harpsdale Workshop and transporting them to Scrabster harbor. One of the units was 7.62 wide and …
Read more…

Unloading rail wagons with 12 and 14 m pipes, Georgemas

Posted: October 2nd, 2018

Customer Deutsche Bahn Project overview Since May throughout September Hugh Simpson (Contractors) Ltd has been unloading pipes at Georgemas rail junction. The pipes are loaded at production in Hartlepool and arrive at Georgemas by rail operated by the Deutsche Bahn. The pipes are 12 and 14 m long …
Read more…

Lifting Seacat Intrepid for Seacat Services, Wick Harbour

Posted: October 2nd, 2018

Customer Seacat Services Ltd. Project overview Hugh Simpson (Contractors) Ltd. lifted offshore support vessel Seacat Intrepid onto the quay in Wick and back into water as it needed some repair done. The vessel was lifted in tandem using 500 T and 350 T cranes, and wire and round slings (basket …
Read more…

Need more information?

Please contact us to discuss your needs by pressing the button below:

Contact Us


Recent News See what’s happening at Hugh Simpson Contractors…

Recent Projects & Case Studies